Raychem QuickStat Manual de Instalação Página 3

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 8
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 2
QuickNet-RK Installation Instructions
3
7
Remove sufficient mortar to expose 4-5 inches of heating
cable on either side of the damage. Using scissors cut the
mesh from the cable to provide room to install the splice.
8
9 10
11
Remove at least 3 inches, and up to 5 inches of heating cable
including the damaged section leaving two protruding ends of
heating cable. If more than 5" of cable has been damaged, the
mat must be replaced.
Remove the damaged section.
Using the 16 AWG opening on the wire strippers carefully score
the outer jacket, 2 inches from the end of both exposed heating
cable ends.
Flex the cable to break the insulation at the score.
12
Using the high setting on the heat gun, heat the jacket to loosen
the insulation.
2"
2"
Score
Heating
cable
3-5"
Damaged
section
Vista de página 2
1 2 3 4 5 6 7 8

Comentários a estes Manuais

Sem comentários