Raychem QuickStat Manual do Utilizador Página 9

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 13
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 8
Simple Installation
Design
Draw room layout
Selecting correct Mat Size
Prepare
Prepare the Sub-floor
Electrical Rough-In
Layout
Roll out the QuickNet Mat
Place floor temperature sensor
Test
Insulation, Heat Cable, Sensor resistance tests must be performed
Repeat after embedding in mortar and installing tiles
Mortar
Put down leveling coat of mortar to embed QuickNet heating mat
Lay Tiles
Apply bond coat of latex modified thin-set mortar
Tile and Grout floor
Finish
Install and Program QuickStat thermostat
Prep Test Mat
Lay Out
Mortar
Test Mat
Lay Tile
Test Mat
Finish
Design
Vista de página 8
1 2 3 4 5 6 7 8 9 10 11 12 13

Comentários a estes Manuais

Sem comentários